Home / Elevators & Escalators / Project Preference / VINAMILK TOWER
Building Type: Office Building
10 Tan Trao Street, Tan My Ward, Ho Chi Minh City
Located in a prime “golden land” area in District 7—an area recognized for its rapid development in Ho Chi Minh City and strong geographical advantages for the future—Vinamilk Tower (Tan Trao Street, Tan Phu Ward, District 7) is surrounded by many other high-end buildings such as Petroland Tower, IMV Center, and Saigon Paragon.
With 14 above-ground floors and 2 basement levels, Vinamilk Tower is a medium-sized office building, well suited for companies with a total staff of 20 employees or more. Like other premium office buildings for lease, Vinamilk Tower is equipped with a wide range of outstanding and modern amenities. Notably, the elevator system is among the most advanced, featuring four NexWay elevator units (one of the high-end product lines of Mitsubishi Electric), imported as complete sets from the manufacturer’s factory in South Korea. NexWay is renowned for its high speed (150 meters per minute) and large load capacity (1,600 kg). In addition, the investor of Vinamilk Tower has signed contracts to install several special features to ensure the elevators operate as safely and efficiently as possible.
For user convenience, each elevator car is equipped with two control panels on both sides, making it easier for passengers to select their destination floors. With the same goal of enhancing user convenience, the AS (Attendant Service) function is installed, allowing the elevator to operate independently and with priority through call buttons and switches on the control panel.
With RCS (Remote Control System – Out-of-Service Remote), the elevator can be controlled via a switch on the monitoring panel to respond to all current calls, then travel to a designated floor and be taken out of service. These two features help building managers easily manage and direct traffic flow when transporting VIP passengers, large quantities of goods, or during maintenance and repairs.
In addition, the MFP (Main Floor Parking) feature is installed to ensure that when the elevator is idle, it remains stationed at the main lobby with the doors open, significantly reducing passenger waiting time. Naturally, a modern elevator system in a high-rise building would not be complete without the Meleye system, which ensures that operating conditions are continuously monitored, tasks are properly assigned, and incidents are handled promptly. Meleye is a premium management system designed specifically for Mitsubishi Electric elevators and is typically adopted by building owners and investors who place the highest priority on security and optimal safety in their properties."
Beyond providing modern conveniences, Vinamilk Tower is also committed to ensuring absolute safety for all occupants and visitors. Therefore, many safety features have been applied, such as infrared multi-beam safety sensors on both doors (MBD-2D – Multi-Beams Door Sensor – 2 Doors) and a door open extension button (DKO-TB). With these two features, passengers can feel secure and avoid door-related accidents, even when moving slowly while carrying bulky items. An intercom communication system is also installed, allowing passengers inside the elevator to contact the outside, which is especially useful in emergency situations.
For unexpected incidents, backup solutions are also in place. First, OEPS (Operation by Emergency Power Source) uses generator power to allow the elevators to continue operating in the event of a power outage. FER (Fire Emergency Return) is activated when a fire is detected, returning the elevator to a pre-designated safe floor and then stopping operation to ensure passenger safety. Among the four elevators, one is additionally equipped with FE (Firefighter’s Emergency Operation), which transforms it into a dedicated elevator for firefighters to use during fire suppression and rescue operations in urgent situations.
Through this careful investment in the elevator system, one can clearly see the scale, long-term and sustainable strategy, and the high standards of the investor for the entire project, as well as their sense of social responsibility—reflecting the Vinamilk brand and its mission toward millions of people living in Vietnam. With its modern architectural design and well-considered amenities, Vinamilk Tower is confidently positioned as an excellent location, capable of providing a dynamic and vibrant working environment for businesses leasing office space here.
For high rise building, medium rise building, hotel, commercial building, residential building
Japan
China
Supervisory System MelEye Enhances Elevator and Escalator Operation Management with the Latest Network Technology. MelEye is applicable to certain elevator and escalator models only.
Use our convenient online form to request more information about any of our products and services. Items marked with an asterisk (*) are required.